United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AG2-168, Russell County
Solar project AG2-168, Russell County is a 95.0 MW solar request withdrawn in the PJM interconnection queue, in Russell County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-168
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Clinch River-Copper Ridge 138 kV
- Location
- Russell County, Virginia
- Technology
- Solar: 95.0 MW
- Total requested
- 95.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 26 February 2021
- Proposed online date
- December 2022
- Withdrawn
- December 2024
Location
Marker shows the centre of Russell County; the queue data does not give exact sites.
Other requests in Russell County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem