United States › Grid › Interconnection queues › Virginia

GAS · PJM

Clinch River Power Plant

Clinch River Power Plant is a 20.0 MW gas request built and operating in the PJM interconnection queue, in Russell County, Virginia, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Feb 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2016 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y3-040
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Clinch River Unit 2
Location
Russell County, Virginia
Technology
Gas: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
28 February 2013
Proposed online date
June 2016
Came online
May 2016

Location

Marker shows the centre of Russell County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Russell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem