United States › Grid › Interconnection queues › West Virginia
SOLAR · PJMSolar project AH2-040, Tucker County
Solar project AH2-040, Tucker County is a 11.5 MW solar request in interconnection study in the PJM interconnection queue, in Tucker County, West Virginia, connecting to APS.
- PlanningQueued Nov 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-040
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- William - Blackwater 69 kV
- Location
- Tucker County, West Virginia
- Technology
- Solar: 11.5 MW
- Total requested
- 11.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 13 November 2021
- Proposed online date
- December 2024
Location
Marker shows the centre of Tucker County; the queue data does not give exact sites.
Power plants in West Virginia · Transmission lines in West Virginia
Other requests in Tucker County
- Solar + storage project AI2-445, Tucker CountySolar + storage · 148 MW · in study
- Backbone WFOnshore wind · 90.0 MW · built
- Battery storage project AD2-126, Tucker CountyBattery storage · 90.0 MW · withdrawn
- Battery storage project AH1-369, Tucker CountyBattery storage · 40.0 MW · withdrawn
- Backbone Mountain Energy StorageBattery storage · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem