United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· WEST

Solar + storage project Q545, Yavapai County

Solar + storage project Q545, Yavapai County is a 360 MW solar + storage request withdrawn in the West interconnection queue, in Yavapai County, Arizona, connecting to Arizona Public Service.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q545
Grid region
West (non-ISO utilities)
Utility / transmission owner
Arizona Public Service
Connection point (POI)
Yavapai 500 kV Station
Location
Yavapai County, Arizona
Technology
Solar: 360 MW Β· Battery
Total requested
360 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
27 September 2023
Proposed online date
December 2027

Location

Marker shows the centre of Yavapai County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Yavapai County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem