United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR Β· MISO

Solar project J3245, Breckinridge County

Solar project J3245, Breckinridge County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Breckinridge County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3245
Grid region
MISO (Midcontinent)
Utility / transmission owner
BIG RIVERS ELECTRIC CORPORATION
Connection point (POI)
Meade County - New Hardinsburg 161.0kV
Location
Breckinridge County, Kentucky
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
26 March 2024
Proposed online date
June 2028
Withdrawn
September 2025

Location

Marker shows the centre of Breckinridge County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Breckinridge County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem