United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

BATTERY STORAGE Β· SOUTHEAST

Battery storage project 608, Desoto County

Battery storage project 608, Desoto County is a 400 MW battery storage request withdrawn in the Southeast interconnection queue, in Desoto County, Mississippi, connecting to Tennessee Valley Authority.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
608
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Location
Desoto County, Mississippi
Technology
Battery: 400 MW
Total requested
400 MW
Queue status
Withdrawn
Entered queue
25 January 2024

Location

Marker shows the centre of Desoto County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Desoto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem