United States › Grid › Interconnection queues › Ohio
GAS · PJMHannibal Port Power Project
Hannibal Port Power Project is a 485 MW gas request built and operating in the PJM interconnection queue, in Monroe County, Ohio, connecting to AEP.
Request details
- Queue ID
- AB2-093
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Ormet 138kV
- Location
- Monroe County, Ohio
- Technology
- Gas: 485 MW
- Total requested
- 485 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 26 April 2016
- Agreement signed
- 12 February 2019
- Proposed online date
- September 2021
- Came online
- June 2021
Location
Marker shows the centre of Monroe County; the queue data does not give exact sites.
Other requests in Monroe County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem