Agr NY-1 is a 1,600 MW offshore wind request withdrawn in the NYISO interconnection queue, in Kings County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedApr 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1330
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- Avangrid Renewables
- Connection point (POI)
- Gowanus 345 kV Substation
- Location
- Kings County, New York
- Technology
- Offshore Wind: 1,600 MW
- Total requested
- 1,600 MW
- Queue status
- Withdrawn
- Entered queue
- 17 February 2022
- Withdrawn
- April 2022
Location
Marker shows the centre of Kings County; the queue data does not give exact sites.
Other requests in Kings County
- Bluepoint Wind 1Offshore wind Β· 1,310 MW Β· in study
- Empire Wind 1Offshore wind Β· 816 MW Β· in study
- NYC Energy LLC - Phase 2Battery storage Β· 220 MW Β· in study
- Battery Park StorageBattery storage Β· 190 MW Β· in study
- Gowanus Energy StorageBattery storage Β· 150 MW Β· in study
- NYC EnergyBattery storage Β· 79.9 MW Β· in study
- Bayonne Energy Center IIIBattery storage Β· 49.8 MW Β· in study
- Pouch Energy Storage SystemBattery storage Β· 47.1 MW Β· in study
- Blue Sky Interconnect 2Offshore wind Β· 2,620 MW Β· withdrawn
- Atlantic Shores Offshore Wind Bight 4Offshore wind Β· 2,100 MW Β· withdrawn
- Atlantic Shores Offshore Wind Bight 1Offshore wind Β· 2,100 MW Β· withdrawn
- OW Ocean Winds East 7Offshore wind Β· 1,600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem