United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR Β· MISOSolar project J795, Gallatin County
Solar project J795, Gallatin County is a 69.0 MW solar request withdrawn in the MISO interconnection queue, in Gallatin County, Illinois, connecting to Southern Illinois Power Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J795
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Southern Illinois Power Cooperative
- Connection point (POI)
- Gallatin Junction 161 kV Substation
- Location
- Gallatin County, Illinois
- Technology
- Solar: 69.0 MW
- Total requested
- 69.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- September 2019
- Withdrawn
- January 2019
Location
Marker shows the centre of Gallatin County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem