United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J2410, Pottawattamie County
Onshore wind project J2410, Pottawattamie County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Pottawattamie County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2410
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Pony Creek-Rolling Hills Wind 345kV
- Location
- Pottawattamie County, Iowa
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- October 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Pottawattamie County; the queue data does not give exact sites.
Other requests in Pottawattamie County
- Onshore wind project J2990, Pottawattamie CountyOnshore wind Β· 200 MW Β· in study
- Gas project J363, Pottawattamie CountyGas Β· 810 MW Β· withdrawn
- Gas project J365, Pottawattamie CountyGas Β· 464 MW Β· withdrawn
- Battery storage project J3018, Pottawattamie CountyBattery storage Β· 300 MW Β· withdrawn
- Onshore wind project J3766, Pottawattamie CountyOnshore wind Β· 235 MW Β· withdrawn
- Gas project J366, Pottawattamie CountyGas Β· 232 MW Β· withdrawn
- Onshore wind project J1122, Pottawattamie CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J1859, Pottawattamie CountyOnshore wind Β· 200 MW Β· withdrawn
- Gas project J361, Pottawattamie CountyGas Β· 116 MW Β· withdrawn
- Solar project J536, Pottawattamie CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project R58, Pottawattamie CountyOnshore wind Β· 3.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem