United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Mainspring Grid

Mainspring Grid is a 50.0 MW battery storage request withdrawn in the PJM interconnection queue, in Amherst County, Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-494
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Mainspring Grid, LLC
Connection point (POI)
Boxwood-Riverville 138 kV
Location
Amherst County, Virginia
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
30 September 2020
Proposed online date
December 2023
Withdrawn
November 2025

Location

Marker shows the centre of Amherst County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Amherst County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem