OTHER · MISOReplace 60 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold
Replace 60 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold is a 60.0 MW other request withdrawn in the MISO interconnection queue, in Linn County, Iowa, connecting to Alliant Energy West.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R1007
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Alliant Energy West
- Connection point (POI)
- ITC DAEC Substation 161kV
- Location
- Linn County, Iowa
- Technology
- Other: 60.0 MW · Battery
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 29 March 2021
- Proposed online date
- July 2023
Location
Marker shows the centre of Linn County; the queue data does not give exact sites.
Other requests in Linn County
- Solar project J504, Linn CountySolar · 50.0 MW · agreement signed
- Gas project E0050, Linn CountyGas · 987 MW · in study
- Nuclear project J3932, Linn CountyNuclear · 646 MW · in study
- Solar project J2268, Linn CountySolar · 400 MW · in study
- Battery storage project J2469, Linn CountyBattery storage · 300 MW · in study
- Replacing 244 MW of Solar with Nuclear; Duane ArnoldNuclear · 251 MW · in study
- Solar project J1444, Linn CountySolar · 200 MW · in study
- Replacing 200 MW of Solar with Nuclear; J1444Nuclear · 200 MW · in study
- Battery storage project J4155, Linn CountyBattery storage · 195 MW · in study
- Replacing 100 MW of Solar with Nuclear; Duane ArnoldNuclear · 100 MW · in study
- Battery storage project J2120, Linn CountyBattery storage · 100 MW · in study
- Gas project J1359, Linn CountyGas · 95.0 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem