Barrett Ridge Energy

Barrett Ridge Energy is a 107 MW battery storage request withdrawn in the NYISO interconnection queue, in Orange County, New York, connecting to CHGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
808
Grid region
NYISO (New York)
Utility / transmission owner
CHGE
Developer
Barrett Ridge Energy, LLC
Connection point (POI)
Sugar Loaf - Vernon 115kV
Location
Orange County, New York
Technology
Battery: 107 MW
Total requested
107 MW
Queue status
Withdrawn
Entered queue
1 April 2019
Withdrawn
April 2021

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.