Solar + storage project AI1-096

Solar + storage project AI1-096 is a 42.0 MW solar + storage request withdrawn in the PJM interconnection queue, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AI1-096
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Pemberton 138 kV
Location
West Virginia
Technology
Solar: 42.0 MW Β· Battery
Total requested
42.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
23 August 2022
Proposed online date
May 2027
Withdrawn
October 2025

Location

No county location in the queue data.

Power plants in West Virginia Β· Transmission lines in West Virginia

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem