United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR + STORAGE Β· PJMSolar + storage project AI1-135, Chowan County
Solar + storage project AI1-135, Chowan County is a 300 MW solar + storage request withdrawn in the PJM interconnection queue, in Chowan County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AI1-135
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Perquimans 230 kV
- Location
- Chowan County, North Carolina
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 8 September 2022
- Proposed online date
- June 2026
- Withdrawn
- December 2024
Location
Marker shows the centre of Chowan County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Chowan County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem