United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR Β· WEST

Solar project BHCT G53, Pueblo County

Solar project BHCT G53, Pueblo County is a 150 MW solar request withdrawn in the West interconnection queue, in Pueblo County, Colorado, connecting to Black Hills Colorado Electric.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
BHCT G53
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Colorado Electric
Connection point (POI)
Baculite Mesa 115 kV Substation
Location
Pueblo County, Colorado
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
14 June 2024
Proposed online date
October 2027

Location

Marker shows the centre of Pueblo County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Pueblo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem