ONSHORE WIND Β· SPP

Onshore wind project GEN-2017-112, Bates County

Onshore wind project GEN-2017-112, Bates County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Bates County, Missouri, connecting to KCPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingSep 2024 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-112
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
KCPL
Connection point (POI)
Clinton β€šΓ„Γ¬ Stilwell 161 kV Line Tap
Location
Bates County, Missouri
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 November 2017
Proposed online date
September 2024
Came online
September 2024
Withdrawn
October 2022

Location

Marker shows the centre of Bates County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Bates County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem