United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· SPPSolar project GEN-2017-090, Bates County
Solar project GEN-2017-090, Bates County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Bates County, Missouri, connecting to KCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedMar 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-090
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- Adrian 161 kV sub
- Location
- Bates County, Missouri
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 31 May 2017
- Proposed online date
- December 2019
- Withdrawn
- March 2022
Location
Marker shows the centre of Bates County; the queue data does not give exact sites.
Other requests in Bates County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem