United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMShockoe Solar Farm
Shockoe Solar Farm is a 60.0 MW solar request withdrawn in the PJM interconnection queue, in Pittsylvania County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-187
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Zenith Solar, LLC
- Connection point (POI)
- Shockoe DP-Chatham 69 kV
- Location
- Pittsylvania County, Virginia
- Technology
- Solar: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 18 March 2019
- Proposed online date
- September 2020
- Withdrawn
- November 2025
Location
Marker shows the centre of Pittsylvania County; the queue data does not give exact sites.
Other requests in Pittsylvania County
- Blue Ridge SolarSolar Β· 150 MW Β· agreement signed
- Southern Virginia SolarSolar Β· 125 MW Β· agreement signed
- Hillandale SolarSolar Β· 102 MW Β· agreement signed
- Firefly SolarSolar Β· 96.0 MW Β· agreement signed
- Firefly SolarSolar Β· 95.0 MW Β· agreement signed
- Solar project AH2-322, Pittsylvania CountySolar Β· 290 MW Β· in study
- Solar project AG2-152, Pittsylvania CountySolar Β· 131 MW Β· in study
- Solar project AI1-021, Pittsylvania CountySolar Β· 105 MW Β· in study
- Battery storage project AH1-314, Pittsylvania CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AG2-272, Pittsylvania CountyBattery storage Β· 55.0 MW Β· in study
- Solar + storage project AH2-404, Pittsylvania CountySolar + storage Β· 35.0 MW Β· in study
- Maplewood SolarSolar Β· 100 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem