United States βΊ Grid βΊ Interconnection queues βΊ Colorado
BATTERY STORAGE Β· WESTBattery storage project GI-2018-32, Boulder County
Battery storage project GI-2018-32, Boulder County is a 100 MW battery storage request withdrawn in the West interconnection queue, in Boulder County, Colorado, connecting to Public Service Company Of Colorado.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedJan 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-2018-32
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Public Service Company Of Colorado
- Connection point (POI)
- Valmont Substation 230 kV
- Location
- Boulder County, Colorado
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- Feasibility Study Underway Request Withdrawn 01/06/2020
- Queue status
- Withdrawn
- Entered queue
- 7 September 2018
- Proposed online date
- December 2022
- Withdrawn
- January 2020
Location
Marker shows the centre of Boulder County; the queue data does not give exact sites.
Other requests in Boulder County
- Hydro project GI-2012-1, Boulder CountyHydro Β· 5.0 MW Β· agreement signed
- Battery storage project 21-11153, Boulder CountyBattery storage Β· 125 MW Β· in study
- Battery storage project 23-05031, Boulder CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project GI-2018-31, Boulder CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project GI-2011-6, Boulder CountySolar Β· 20.0 MW Β· withdrawn
- Solar project GI-2011-5, Boulder CountySolar Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem