United States › Grid › Interconnection queues › Colorado

BATTERY STORAGE · WEST

Battery storage project 21-11153, Boulder County

Battery storage project 21-11153, Boulder County is a 125 MW battery storage request in interconnection study in the West interconnection queue, in Boulder County, Colorado, connecting to Platte River Power Authority.

Queue statusIn planning
  1. PlanningQueued Nov 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
21-11153
Grid region
West (non-ISO utilities)
Utility / transmission owner
Platte River Power Authority
Connection point (POI)
Longs Peak 230kV
Location
Boulder County, Colorado
Technology
Battery: 125 MW
Total requested
125 MW
Study phase
System Impact Study
Queue status
Active
Entered queue
15 November 2021
Proposed online date
March 2027

Location

Marker shows the centre of Boulder County; the queue data does not give exact sites.

Power plants in Colorado · Transmission lines in Colorado

Other requests in Boulder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem