BATTERY STORAGE · NYISO

Babylon Storage

Babylon Storage is a 50.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1451
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Empire Reserve Energy, LLC
Connection point (POI)
Pinelawn 69 kV station
Location
Suffolk County, New York
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Queue status
Withdrawn
Entered queue
13 October 2022

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem