United States βΊ Grid βΊ Interconnection queues βΊ Alabama
SOLAR Β· SOUTHEASTSolar project IC-969, Bullock County
Solar project IC-969, Bullock County is a 79.0 MW solar request withdrawn in the Southeast interconnection queue, in Bullock County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2021 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-969
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Eufaula - Union Springs 115 kV Line, Hurtsboro Tap
- Location
- Bullock County, Alabama
- Technology
- Solar: 79.0 MW
- Total requested
- 79.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 17 June 2021
- Withdrawn
- May 2022
Location
Marker shows the centre of Bullock County; the queue data does not give exact sites.
Other requests in Bullock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem