United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR + STORAGE Β· MISOSolar + storage project J2687, Hancock County
Solar + storage project J2687, Hancock County is a 300 MW solar + storage request withdrawn in the MISO interconnection queue, in Hancock County, Indiana, connecting to INDIANAPOLIS POWER & LIGHT COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2687
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- INDIANAPOLIS POWER & LIGHT COMPANY
- Connection point (POI)
- Sunnyside to Gwynneville 345kV line
- Location
- Hancock County, Indiana
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- September 2026
- Withdrawn
- October 2025
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
- Solar + storage project J2650, Hancock CountySolar + storage Β· 236 MW Β· withdrawn
- Solar project J1152, Hancock CountySolar Β· 200 MW Β· withdrawn
- Solar project J3347, Hancock CountySolar Β· 140 MW Β· withdrawn
- Onshore wind project J1116, Hancock CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar + storage project J3789, Hancock CountySolar + storage Β· 77.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem