πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

SOLAR + STORAGE Β· MISO

Solar + storage project J2687, Hancock County

Solar + storage project J2687, Hancock County is a 300 MW solar + storage request withdrawn in the MISO interconnection queue, in Hancock County, Indiana, connecting to INDIANAPOLIS POWER & LIGHT COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2687
Grid region
MISO (Midcontinent)
Utility / transmission owner
INDIANAPOLIS POWER & LIGHT COMPANY
Connection point (POI)
Sunnyside to Gwynneville 345kV line
Location
Hancock County, Indiana
Technology
Solar: 300 MW Β· Battery
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
September 2026
Withdrawn
October 2025

Location

Marker shows the centre of Hancock County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Hancock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem