United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 9, Douglas County

Onshore wind project 9, Douglas County is a 80.0 MW onshore wind request withdrawn in the West interconnection queue, in Douglas County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2007 (completed)
  2. Withdrawn / abandonedJul 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
9
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Chelan-Stratford 115 kV
Location
Douglas County, Washington
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
20 December 2007
Proposed online date
January 2010
Withdrawn
July 2008

Location

Marker shows the centre of Douglas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Douglas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem