United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project IC-475, Hancock County
Solar project IC-475, Hancock County is a 78.6 MW solar request withdrawn in the Southeast interconnection queue, in Hancock County, Mississippi, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2016 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- ConsentedOct 2018 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-475
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- NASA North 115 kV SS
- Location
- Hancock County, Mississippi
- Technology
- Solar: 78.6 MW
- Total requested
- 78.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 29 July 2016
- Agreement signed
- 24 October 2018
- Withdrawn
- November 2021
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Hancock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem