United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project IC-1022, Hancock County
Solar + storage project IC-1022, Hancock County is a 74.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Hancock County, Mississippi, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1022
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- NASA North SS Substation 115 kV Bus
- Location
- Hancock County, Mississippi
- Technology
- Solar: 74.0 MW Β· Battery
- Total requested
- 74.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 18 February 2022
- Proposed online date
- October 2026
- Withdrawn
- January 2025
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Hancock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem