United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project AB2-051, City Of Chesapeake County
Gas project AB2-051, City Of Chesapeake County is a 840 MW gas request withdrawn in the PJM interconnection queue, in City Of Chesapeake County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2016 (completed)
- Withdrawn / abandonedOct 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB2-051
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Chesapeake 230kV
- Location
- City Of Chesapeake County, Virginia
- Technology
- Gas: 840 MW
- Total requested
- 840 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 14 March 2016
- Proposed online date
- January 2021
- Withdrawn
- October 2018
Location
Marker shows the centre of City Of Chesapeake County; the queue data does not give exact sites.
Other requests in City Of Chesapeake County
- Cvow 2, Oss 2 βΓΓ¬ T2G07Offshore wind Β· 836 MW Β· in study
- Cvow 1, Oss 1 - T1L11Offshore wind Β· 833 MW Β· in study
- Cvow 3, Oss 3 βΓΓ¬ T3G15Offshore wind Β· 820 MW Β· in study
- Battery storage project AH2-133, City Of Chesapeake CountyBattery storage Β· 300 MW Β· in study
- Battery storage project AH2-330, City Of Chesapeake CountyBattery storage Β· 100 MW Β· in study
- Yadkins Energy CenterBattery storage Β· 100 MW Β· in study
- Battery storage project AH2-241, City Of Chesapeake CountyBattery storage Β· 45.0 MW Β· in study
- Shillelagh SolarSolar Β· 118 MW Β· built
- Bedford Solar CenterSolar Β· 70.0 MW Β· built
- Elizabeth River GT3Gas Β· 20.0 MW Β· built
- Elizabeth River GT1Gas Β· 20.0 MW Β· built
- Solar project AC1-147, City Of Chesapeake CountySolar Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem