SOLAR Β· PJMSolar project AG2-334, Huntingdon County
Solar project AG2-334, Huntingdon County is a 10.0 MW solar request withdrawn in the PJM interconnection queue, in Huntingdon County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-334
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Miller REC - Warrior Ridge 46 kV
- Location
- Huntingdon County, Pennsylvania
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 25 March 2021
- Proposed online date
- January 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Huntingdon County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Huntingdon County
- HU-PaulsSolar Β· 20.0 MW Β· suspended
- HU-LoggingSolar Β· 20.0 MW Β· suspended
- Solar + storage project AG1-473, Huntingdon CountySolar + storage Β· 53.9 MW Β· withdrawn
- Solar + storage project AG2-590, Huntingdon CountySolar + storage Β· 38.2 MW Β· withdrawn
- Scarecrow SolarSolar Β· 20.0 MW Β· withdrawn
- Solar project AF1-138, Huntingdon CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AF2-146, Huntingdon CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AF2-148, Huntingdon CountySolar Β· 13.5 MW Β· withdrawn
- Solar project AG2-205, Huntingdon CountySolar Β· 3.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem