United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G817, Grant County

Onshore wind project G817, Grant County is a 5.9 MW onshore wind request withdrawn in the MISO interconnection queue, in Grant County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G817
Grid region
MISO (Midcontinent)
Connection point (POI)
MRES Elbow Lake - Brandon 115kV
Location
Grant County, Minnesota
Technology
Wind: 5.9 MW
Total requested
5.9 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
16 July 2007
Withdrawn
September 2015

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem