United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project G817, Grant County
Onshore wind project G817, Grant County is a 5.9 MW onshore wind request withdrawn in the MISO interconnection queue, in Grant County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2007 (completed)
- Withdrawn / abandonedSep 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G817
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- MRES Elbow Lake - Brandon 115kV
- Location
- Grant County, Minnesota
- Technology
- Wind: 5.9 MW
- Total requested
- 5.9 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 16 July 2007
- Withdrawn
- September 2015
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Grant County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem