United States βΊ Grid βΊ Interconnection queues βΊ Michigan
GAS Β· MISOGas project J1119, Jackson County
Gas project J1119, Jackson County is a 600 MW gas request withdrawn in the MISO interconnection queue, in Jackson County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedJun 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1119
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Tompkins 345 kV Substation
- Location
- Jackson County, Michigan
- Technology
- Gas: 600 MW
- Total requested
- 600 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- January 2021
- Withdrawn
- June 2019
Location
Marker shows the centre of Jackson County; the queue data does not give exact sites.
Other requests in Jackson County
- Solar project J1310, Jackson CountySolar Β· 125 MW Β· under construction
- Solar project J1472, Jackson CountySolar Β· 100 MW Β· agreement signed
- Battery storage project J2589, Jackson CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J2588, Jackson CountyBattery storage Β· 120 MW Β· in study
- Battery storage project J2064, Jackson CountyBattery storage Β· 100 MW Β· in study
- Gas project G234, Jackson CountyGas Β· 22.0 MW Β· built
- Solar project J1052, Jackson CountySolar Β· 100 MW Β· withdrawn
- Solar project J1552, Jackson CountySolar Β· 100 MW Β· withdrawn
- Solar project J1014, Jackson CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem