Mesquite Lake

Mesquite Lake is a 250 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2007 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
291
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Ivanpah Substation 230kV
Location
San Bernardino County, California
Technology
Solar: 250 MW
Total requested
250 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
27 December 2007
Proposed online date
June 2015
Withdrawn
November 2008

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem