Solar project J1854, Wabash County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Wabash County, Indiana, connecting to DUKE ENERGY INDIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedDec 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1854
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
Wabash - Greentown 138kV
Location
Wabash County, Indiana
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2
Queue status
Withdrawn
Entered queue
18 August 2021
Proposed online date
May 2025
Withdrawn
December 2021

Location

Marker shows the centre of Wabash County; the queue data does not give exact sites.