United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· SOUTHEASTSolar project 4867, Brunswick County
Solar project 4867, Brunswick County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Brunswick County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 4867
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Masked
- Connection point (POI)
- BNP2-Wallace 230kV
- Location
- Brunswick County, North Carolina
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 17 January 2014
Location
Marker shows the centre of Brunswick County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Brunswick County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem