United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

BATTERY STORAGE Β· WEST

Battery storage project GI-SISS-2025-02, Logan County

Battery storage project GI-SISS-2025-02, Logan County is a 150 MW battery storage request withdrawn in the West interconnection queue, in Logan County, Colorado, connecting to Tri-State Generation and Transmission Association.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-SISS-2025-02
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tri-State Generation and Transmission Association
Connection point (POI)
North Yuma 230kV Substation
Location
Logan County, Colorado
Technology
Battery: 150 MW
Total requested
150 MW
Queue status
Withdrawn
Entered queue
9 June 2025

Location

Marker shows the centre of Logan County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Logan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem