United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
HYDRO Β· WESTHydro project 259, Big Horn County
Hydro project 259, Big Horn County is a 4.0 MW hydro request withdrawn in the West interconnection queue, in Big Horn County, Wyoming, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 259
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit 4H36, out of Pitchfork substation
- Location
- Big Horn County, Wyoming
- Technology
- Hydro: 4.0 MW
- Total requested
- 4.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- REMOVED-LACK OF PROGRESS
- Queue status
- Withdrawn
- Entered queue
- 3 February 2009
- Proposed online date
- March 2011
Location
Marker shows the centre of Big Horn County; the queue data does not give exact sites.
Other requests in Big Horn County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem