United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR + STORAGE Β· MISOSolar + storage project J2137, Ohio County
Solar + storage project J2137, Ohio County is a 78.2 MW solar + storage request withdrawn in the MISO interconnection queue, in Ohio County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2137
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- BIG RIVERS ELECTRIC CORPORATION
- Connection point (POI)
- 345 kV Wilson Substation
- Location
- Ohio County, Kentucky
- Technology
- Solar: 78.2 MW Β· Battery
- Total requested
- 78.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2
- Queue status
- Withdrawn
- Entered queue
- 26 October 2021
- Proposed online date
- October 2024
- Withdrawn
- November 2021
Location
Marker shows the centre of Ohio County; the queue data does not give exact sites.
Other requests in Ohio County
- Solar project J2739, Ohio CountySolar Β· 100 MW Β· in study
- Solar project LGE-GIS-2021-003, Ohio CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project J2282, Ohio CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project J2073, Ohio CountySolar + storage Β· 91.5 MW Β· withdrawn
- Solar + storage project J2145, Ohio CountySolar + storage Β· 50.0 MW Β· withdrawn
- Other project LGE-GIS-2008-002, Ohio CountyOther Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem