United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
ONSHORE WIND Β· SPPOnshore wind project GEN-2024-112, Washita County
Onshore wind project GEN-2024-112, Washita County is a 250 MW onshore wind request withdrawn in the SPP interconnection queue, in Washita County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-112
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Chisholm - Gracemont 345 kV line
- Location
- Washita County, Oklahoma
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- December 2031
- Withdrawn
- August 2025
Location
Marker shows the centre of Washita County; the queue data does not give exact sites.
Other requests in Washita County
- Onshore wind project GEN-2016-037, Washita CountyOnshore wind Β· 300 MW Β· built
- Onshore wind project GEN-2008-023, Washita CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project GEN-2012-028, Washita CountyOnshore wind Β· 74.0 MW Β· built
- Onshore wind project GEN-2024-111, Washita CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2011-009, Washita CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2009-060, Washita CountyOnshore wind Β· 84.0 MW Β· withdrawn
- Solar project GEN-2018-021, Washita CountySolar Β· 74.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem