SOLAR + STORAGE Β· MISOSolar + storage project J2776, Fulton County
Solar + storage project J2776, Fulton County is a 10.0 MW solar + storage request withdrawn in the MISO interconnection queue, in Fulton County, Indiana, connecting to NORTHERN INDIANA PUBLIC SERVICE COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2776
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN INDIANA PUBLIC SERVICE COMPANY
- Connection point (POI)
- WINAMAC to BRUCE LAKE 69kV (Circuit ID 6913) NIPSCO AREA
- Location
- Fulton County, Indiana
- Technology
- Solar: 10.0 MW Β· Battery
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 7 September 2022
- Proposed online date
- January 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Fulton County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem