United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· MISOOnshore wind project J3751, Madison County
Onshore wind project J3751, Madison County is a 236 MW onshore wind request withdrawn in the MISO interconnection queue, in Madison County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3751
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- 7COFFEEN - 7ROXFORD 345.0kV
- Location
- Madison County, Illinois
- Technology
- Wind: 236 MW
- Total requested
- 236 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 April 2024
- Proposed online date
- October 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem