GAS · PJMFreemont Energy Center
Freemont Energy Center is a 38.0 MW gas request built and operating in the PJM interconnection queue, in Sandusky County, Ohio, connecting to ATSI.
Request details
- Queue ID
- AD1-052
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Freemont Energy Center
- Location
- Sandusky County, Ohio
- Technology
- Gas: 38.0 MW
- Total requested
- 38.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 10 August 2017
- Proposed online date
- October 2020
- Came online
- February 2021
Location
Marker shows the centre of Sandusky County; the queue data does not give exact sites.
Other requests in Sandusky County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem