Solar project J3869, Pike County

Solar project J3869, Pike County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Pike County, Missouri, connecting to AMEREN MISSOURI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3869
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN MISSOURI
Connection point (POI)
5PIKE 1 - 5CALUMET 161.0kV
Location
Pike County, Missouri
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
2 December 2024
Proposed online date
June 2029
Withdrawn
September 2025

Location

Marker shows the centre of Pike County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Pike County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem