United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J2077, Livingston Parish County
Solar project J2077, Livingston Parish County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Livingston Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2077
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Independence (6INDEPD)
- Location
- Livingston Parish County, Louisiana
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 10 December 2021
- Proposed online date
- April 2024
- Withdrawn
- October 2023
Location
Marker shows the centre of Livingston Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Livingston Parish County
- Gas project J4071, Livingston Parish CountyGas Β· 1,500 MW Β· in study
- Solar + storage project APP-100259, Livingston Parish CountySolar + storage Β· 508 MW Β· in study
- Battery storage project J4100, Livingston Parish CountyBattery storage Β· 500 MW Β· in study
- Solar project J1538, Livingston Parish CountySolar Β· 268 MW Β· withdrawn
- Solar project J900, Livingston Parish CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem