Solar project AF1-234, Berks County

Solar project AF1-234, Berks County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Berks County, Pennsylvania, connecting to ME.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandonedNov 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF1-234
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ME
Connection point (POI)
Baldy-Wesnberg 69 kV
Location
Berks County, Pennsylvania
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
27 September 2019
Proposed online date
December 2022
Withdrawn
November 2019

Location

Marker shows the centre of Berks County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Berks County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem