United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
GAS Β· SOUTHEASTGas project 20200910002, Berkeley County
Gas project 20200910002, Berkeley County is a 720 MW gas request withdrawn in the Southeast interconnection queue, in Berkeley County, South Carolina, connecting to Dominion Energy South Carolina.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20200910002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Dominion Energy South Carolina
- Connection point (POI)
- Williams - DuPont 230 kV
- Location
- Berkeley County, South Carolina
- Technology
- Gas: 720 MW
- Total requested
- 720 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Proposed online date
- June 2024
Location
Marker shows the centre of Berkeley County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Berkeley County
- Battery storage project GenRep1, Berkeley CountyBattery storage Β· 300 MW Β· in study
- Battery storage project 308, Berkeley CountyBattery storage Β· 250 MW Β· in study
- Battery storage project 20230829013, Berkeley CountyBattery storage Β· 199 MW Β· in study
- Solar + storage project 206, Berkeley CountySolar + storage Β· 198 MW Β· in study
- Gas project 20211118005, Berkeley CountyGas Β· 65.4 MW Β· in study
- Gas project 20211118001, Berkeley CountyGas Β· 13.4 MW Β· in study
- Coal project 17, Berkeley CountyCoal Β· 620 MW Β· built
- Coal project 23, Berkeley CountyCoal Β· 600 MW Β· built
- Coal project 24, Berkeley CountyCoal Β· 600 MW Β· built
- Coal project 16, Berkeley CountyCoal Β· 540 MW Β· built
- Coal project 5, Berkeley CountyCoal Β· 306 MW Β· built
- Hydro project 1, Berkeley CountyHydro Β· 128 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem