United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMSolar project AI1-101, Lackawanna County
Solar project AI1-101, Lackawanna County is a 100 MW solar request in interconnection study in the PJM interconnection queue, in Lackawanna County, Pennsylvania, connecting to PPL.
- PlanningQueued Aug 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI1-101
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Pocono-Acahela 230 kV
- Location
- Lackawanna County, Pennsylvania
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 30 August 2022
- Proposed online date
- September 2029
Location
Marker shows the centre of Lackawanna County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Lackawanna County
- Lackawanna Thermal Generating StationGas · 1,000 MW · built
- Lackawanna Thermal Generating StationGas · 370 MW · built
- Lackawanna Thermal Generating StationGas · 113 MW · built
- ArchbaldGas · 44.0 MW · built
- Milan EnergyGas · 19.9 MW · built
- Archbald Generating StationOther · 9.2 MW · built
- ArchbaldGas · 6.3 MW · built
- Other project AE2-032, Lackawanna CountyOther · 811 MW · withdrawn
- Gas project U2-075, Lackawanna CountyGas · 636 MW · withdrawn
- Gas project B45, Lackawanna CountyGas · 555 MW · withdrawn
- Gas project AB1-108, Lackawanna CountyGas · 485 MW · withdrawn
- Gas project AH1-697, Lackawanna CountyGas · 78.6 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem