United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
SOLAR Β· PJMSolar project AG1-162, Mason County
Solar project AG1-162, Mason County is a 27.4 MW solar request withdrawn in the PJM interconnection queue, in Mason County, West Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-162
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Sporn 138 kV
- Location
- Mason County, West Virginia
- Technology
- Solar: 27.4 MW
- Total requested
- 27.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 14 September 2020
- Proposed online date
- December 2022
- Withdrawn
- September 2023
Location
Marker shows the centre of Mason County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Mason County
- New Haven SolarSolar Β· 100 MW Β· agreement signed
- Mountaineer #1Coal Β· 20.0 MW Β· built
- Coal project N41, Mason CountyCoal Β· 1,200 MW Β· withdrawn
- Riverview Solar ISolar + storage Β· 99.0 MW Β· withdrawn
- Solar project AJ1-010, Mason CountySolar Β· 35.0 MW Β· withdrawn
- Solar project AD1-051, Mason CountySolar Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem