Solar project AG1-162, Mason County

Solar project AG1-162, Mason County is a 27.4 MW solar request withdrawn in the PJM interconnection queue, in Mason County, West Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-162
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Sporn 138 kV
Location
Mason County, West Virginia
Technology
Solar: 27.4 MW
Total requested
27.4 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
14 September 2020
Proposed online date
December 2022
Withdrawn
September 2023

Location

Marker shows the centre of Mason County; the queue data does not give exact sites.

Power plants in West Virginia Β· Transmission lines in West Virginia

Other requests in Mason County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem