United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMBrookview Solar I
Brookview Solar I is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Adams County, Pennsylvania, connecting to ME.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandonedDec 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-006
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Germantown 115 kV
- Location
- Adams County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 23 April 2018
- Proposed online date
- December 2025
- Withdrawn
- December 2023
Location
Marker shows the centre of Adams County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Adams County
- Club Ford Energy CenterSolar Β· 20.0 MW Β· agreement signed
- WA-Cochecton 2Solar Β· 20.0 MW Β· agreement signed
- Shamrock Energy CenterSolar Β· 20.0 MW Β· agreement signed
- BL-Diamond Bear RocksSolar Β· 16.3 MW Β· agreement signed
- Granite Hill SolarSolar Β· 70.0 MW Β· suspended
- HunterstownGas Β· 830 MW Β· built
- Adams Solar LLCSolar Β· 80.0 MW Β· built
- Hunterstown CT FacilityGas Β· 4.0 MW Β· built
- Shawville Generating StationGas Β· 4.0 MW Β· built
- Shawville Generating StationGas Β· 3.0 MW Β· built
- Orrtanna Station Unit C1Other Β· 1.0 MW Β· built
- Shawville Generating StationGas Β· 1.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem