United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

SOLAR Β· PJM

Grand View Solar I

Grand View Solar I is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Berks County, Pennsylvania, connecting to ME.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-492
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ME
Developer
PD Solar 2 LLC
Connection point (POI)
Bernville 13 kV
Location
Berks County, Pennsylvania
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
11 September 2021
Proposed online date
July 2024
Withdrawn
June 2025

Location

Marker shows the centre of Berks County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Berks County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem