SOLAR Β· PJMSolar project AI1-014, Berkeley County
Solar project AI1-014, Berkeley County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Berkeley County, West Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2022 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AI1-014
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Bismark-Doubs 500 kV
- Location
- Berkeley County, West Virginia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 1 April 2022
- Proposed online date
- December 2026
- Withdrawn
- May 2022
Location
Marker shows the centre of Berkeley County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Berkeley County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem